How do job seekers use social media?
Table of Contents
New 43 Jobs at Julius Nyerere Hydro Power Project JHNPP | JVACEE
JHNPP jobs |JVACEE jobs, JVACEE is a Joint venture company of Arab Contractors and El-sewedy Electric, dealing with the scope of Engineering, Procurement & Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania, which is expected to produce 2,115 MW of installed capacity.
An integrated energy solutions -design and build- provider specialized in Power Generation, Water Treatment and Hydropower while currently diversifying our business segments to include Mobility and Oil and Gas.
The transformers will increase transmission voltage of the electricity produced by turbines from 15 kV to 400 kV. This was revealed by Resident Engineer John Mageni from Tanroads Engineering Consultation Unit during a recent official tour of the project’s site.
Governance. Eng. Mageni mentioned other main ongoing work as construction of the power house. According to Mageni,jobwikis jobs foundation work for the construction of the switchyard where electricity produced at the JNHPP will be connected to the national grid has already begun.
Other ongoing work include construction of the main dam, construction of permanent bridge inside Rufiji River, and construction of three power water ways. The power water ways will channel water to hydro turbines.
He said that Chinese Company Dongfang Electric Corporation is proceeding with the making and installation of nine electromechanical units of equipment, which will have the capacity to produce 235 MW each.
“So far, construction work is going on well and the government has already paid Arab Contractors and Elsewedy Electricity a total of $1.16 B (TZS 2,7 T) out of $2.8 B (TZS 6.5 T),” said Dr. Tito Mwinuka, managing director of Tanzania Electrical Supply Company (TANESCO).
Julius Nyerere Hydro Power Project JHNPP Jobs
J–V–A–C–E–E, Julius Nyerere Hydro Power Project (JNHPP) is Urgently Looking for the Following Candidates to fill the available below Positions :–
- Motor Grader Operators —- 10 positions
- Excavator Operators ——– 20 Positions
- Bull Dozer Operators ——– 03 Positions
- Pipe Fitters ——————- 04 Positions
- Supervisor Piping ———– 01 Positions
- Supervisor HVAC ———— 01 Positions
- Wheel Loaders ————— 04 Positions
Qualifications and Experience
- The Ideal candidate should posses a working experience of not less than 3 Years.
How to Apply for Ajira Mpya JVACEE Jobs 2022
Interested candidates should send their up to date CV’s and ID (National, Voter’s ID or Driving License) to [email protected] and Visit our nearest representative offices of Kisaki Morogoro, or Mloka Rufiji, Pwani.
Deadline is 10th July 2022
Interviews and work station will be at Julius Nyerere Hydropower Project (JNHPP)
This position is open for Tanzanian Locals only.
Dear reader, do not be confused when you come across very different headlines about Job Vacancies at Julius Nyerere Hydro Power Project JHNPP | JVACEE
The reader may find it confusing and think it is a different ad, The reason for having a different title for this ad is due to the presence of many bloggers in Tanzania and every blogger writes a title in his own words.
You can find a title like this on popular blogs like Mabumbe jobs, Ajirayako jobs, Jobwikis jobs and Ajiraleo jobs